Conference Centre “Olympic Hall” with 2.500 seats at the hotel complex Porto Karras, Chalkidiki

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, natural gas supply. Duration of work: 03.2004 until 06.2005.
Duration of work: 03.2004 until 06.2005.