Conference Centre with 1.500 seats at the hotel complex A.K.S. at Porto Heli

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, rainwater drainage, natural gas supply.
Duration of work: 12.2004 until 05.2005.