Hotel “Pendelikon” in Kefalari with additional restaurant and spa

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, fire alarm system, security system and electrical power supply.

Duration of work: 05.2007 until 08.2007.