New town hall building for the municipality of Aigio, Peloponnesus

Works included electrical power supply, BMS, fire alarm system, security system, data network, potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, CO2 fire protection systems.
Duration of work: 20.06.2006 until 12.05.2007.