Office Building with seven levels at Posidonos Street, Glyfada

Works included potable water supply, sewage water, rainwater drainage, heating and chilled water pipe work, fire fighting and sprinkler network, ventilation duct work. 

Duration of work: 03.2001 until 08.2002