EXPERIENCES AND EXECUTED PROJECTS

We want to show here a selection of our executed projects.

During the years our enterprise executed several projects. Some of these projects are so extensive that they are continuing until today.

Leroy Merlin V. Sofias, Athens

’’LEROY MERLIN’’, V. Sofias 112, Athens. Total construction of the mechanicals installations as : potable water supply, sewage water, fire fighting, rainwater drainage.

Work started at 2017

’’IASIS PHARMA’’ Factory, L. Varis - Koropi

’’IASIS PHARMA’’ Factory, L. Varis - Koropiou, Koropi.

Work started at 2017 - 2018

’’Medifirst – Interamerikan’’, Marousi Attica

Building of ’’Medifirst – Interamerikan’’, Marousi.

Work started at 2017

’’Biogas Plant (1,5MW) ’’, Trikala

 ’’Biogas Plant (1,5MW) ’’, Fiki Area, Trikala. Total mechanical construction and installation of equipment.

Work started at 2017

Luxury Hotel 5* 'San Stefano' (B Fase) Benitses, Kerkyra Island

New building constructions - installations. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2016 – 2017.

'ARRIVALS LEVEL & AIRSIDE', Athens International Airport, Spata

Total construction of the mechanicals installations.

Work started at 2016.

'ARRIVALS LEVEL & AIRSIDE', Athens International Airport, Spata

Total construction of the mechanicals installations.

Work started at 2016.

Building of 'National Bank', Stadiou 38 – Athens

Construction of the mechanicals installations as: switching of the heating pumps, fan coils switching and total construction of the machinery area.
Work started 2015 until 2016.

'LEROY MERLIN', L. Kifisias 73 & Pournara

Total construction of the mechanicals installations as : potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2016.

'DHL FINGER', Athens International Airport, Spata

Total construction of the mechanicals installations.
Work started at 2015 until 2016.

Reconstruction of 'Psychiatric Hospital of Attica', Athens

Works included potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2015.

'Biogas Plant (0,95MW)', Krya Vrysi - Area of Pella

Total mechanical construction and installation of equipment.

Work started at 2015 until 2016.

'ELBISCO ABEE' Factory, L. Marathonos – Pikermi

Total construction of the mechanicals installations as : potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2015 until 2016.

Tourist Land Marina Area of Floisvos, P. Faliro

Works included potable water supply, sewage water, vacuum system and fire networks.

Work started at 2014.

Library of 'Philosophy School', University of Athens

Reconstruction included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2014.

Indoor Gym & Swimming Pool, Agioi Anargyroi

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2014 until today.

Supermarket building (2 floors) for company 'AV Vasilopoulos' - Argyroupoleos 63, Argyroupoli

Works included potable water supply, sewage water, fire fighting, rainwater drainage, fuel gas.
Work started at 2014.

Reconstruction of 'General Bank' Building, L. Mesogeion 109-111

Works included potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2014 until 2015.

Luxury Hotel 5* 'San Stefano' Benitses, Kerkyra Island

New building constructions - installations. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2014 until today.

New Building Theater of Zakynthos Island

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013 – 2014.

H&M Shop 3.000m² at Cosmos Shopping Center, Thessaloniki

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2014.

Reconstruction of 'National Bank of Greece' Peiraios 74

Works included potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2014.

Production Factory of Plastics 'Argo A.E.B.E.', Koropi

Reconstruction of industrial networks : compressed air, cooling tower and cold water with stainless pipe 304L.
Work started at 2014 until 2015.

Nobu Restaurant at City Link Shopping Center, Athens

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013 – 2014.

Reconstruction of the General Hospital of Athens ’’Sismanogleio’’, Marousi

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013 until today.

Reconstruction of “Peiraios Bank’’ Building, L. Alexandras 170

Works included potable water supply, sewage water, fire fighting and extinguishing CO2, rainwater drainage.
Work started at 2013.

Reconstruction of the General Hospital of Athens 'Evaggelismos', Ypsilantou 45-47

Reconstruction in hospital wards like : Artificial Kidney & Research Center. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013.

Reconstruction of Agricaltural Bank of Greece “A.T.E Bank’’, Heimaras 11, Marousi.

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, placement of fire dampers.

Work started at 2013.

Historical Group of 'Peiraios Bank', Tavros

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013 – 2014.

Technical distribution board building 150KV/MT 'GIS Ampelokipon', Soutsou & Tsoha

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2013 until 2015.

Supermarket building for company 'Sklavenitis', L. Fylis 217, Kamatero

Works included potable water supply, sewage water, fire fighting, rainwater drainage, fuel gas.
Work started at 2012.

New construction of the General Hospital of Athens 'G. Gennimatas', L. Mesogeion 154

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, fuel gas.

Work started at 2012 until today.

Building of EVGA. Iera Odos 88, Votanikos

Reconstruction of unit production. Works included water supply, sewage water, fire networks, cooling, CO2, oil, compressed air.

Work started 2011.

Primary School of Agios Ioannis Rentis, Attiki

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, fuel gas.
Work started 2011 until 2013.

New Port of Igoumenitsa (B Phase)

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 2009 until 2011.

Office Building in Tavros

Works included potable water supply, sewage water, fire fighting, rainwater drainage.
Work started at 2010.

Office Building & clinics in Marfits Company, Halandri

Works included water supply, sewage water, rainwater drainage.
Work started 2010 until today.

New construction of the private clinic EUROMEDICA on the island of Corfu

New construction of the private clinic EUROMEDICA on the island of Corfu. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.

Work started at 11.2008 until today.

New construction of the General Hospital Kerkira on the island of Corfu

Works included heating, chilled water and steam pipe work and the construction of the plant rooms.

Work started at 02.2008 until today.

Hotel “Theoxenia” in Portaria, Pillion

Refurbishment, alteration of existing building. Enlargement with new building constructions to 70 rooms. Installations will be complete new. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.

Work started at 10.2007 until today.

Construction of a supermarket in Aigio, Peloponnesus, for company AB Vassilopoulos

Works included electrical power supply, fire alarm system, potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Duration of work: 06.2007 until 10.2007.

Hotel “Pendelikon” in Kefalari with additional restaurant and spa

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, fire alarm system, security system and electrical power supply.

Duration of work: 05.2007 until 08.2007.

Hotel “Posidon” on the island of Spetses

New construction of an hotel with 80 rooms. Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 05.2007 until today.

Two villa constructions in the area of Saronida, Attica

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.
Work started at 20.02.2007 until today.

Office Building, Building H of the Technical Centre of the main branch of EUROBANK, Nea Ionia, Athens

Conversion of the previous Administration Building of the Olympic Games Athens 2004. Works included new pipe installation for heating, chilled water, potable water supply and sewage water.
Duration of work: 19.02.2007 until 15.04.2007.

Central market building for company ALEX PACK in Pallinis, Attica.

Building includes offices, warehouses and an additional shop. Works included refurbishment of plant rooms and additional installation of new pipe works for heating, chilled water and sprinkler.

Duration of work: 12.11.2006 until 28.02.2007

New building construction for a factory of 11.000 m² surface in Inofita, Biotia

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work.

Duration of work: 20.09.2006 until 22.04.2007.

Office Building (named Bodosakeio), Amalias 20, Syntagma Square, Athens

Complete refurbishment and alteration of a nine level building. Installation of a new pipe work for heating and chilled water.

Duration of work: 12.09.2006 until 25.02.2007.

New town hall building for the municipality of Aigio, Peloponnesus

Works included electrical power supply, BMS, fire alarm system, security system, data network, potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, CO2 fire protection systems.
Duration of work: 20.06.2006 until 12.05.2007.

Technical distribution board building (GIS, DEI Thessaloniki) of 1.100 m² surface

Works included potable water supply, sewage water, fire fighting, CO2 fire protection systems, split unit systems for air conditioning.

Duration of work: 20.06.2006 until 12.05.2007.

Two villa constructions in the area of Lagonissi, Attica

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage.

Work started at 20.04.2006 until today.

Technical Centre of the main branch of EUROBANK, Nea Ionia, Athens

Conversion of the previous Administration Building of the Olympic Games Athens 2004. Works included new pipe installation for heating, chilled water and sprinkler networks. Modification and alterations of the plant rooms.
Duration of work: 20.02.2006 until 25.07.2006.

Villa construction on the island of Spetses

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, rainwater drainage, liquid gas supply.

Duration of work: 18.12.2005 until 28.02.2007.

Conference Centre with 1.500 seats at the hotel complex A.K.S. at Porto Heli

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, rainwater drainage, natural gas supply.
Duration of work: 12.2004 until 05.2005.

Music Hall “Athens Arena”, Piraeus Street 166, Athens

One of the largest music halls in Europe. Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, rainwater drainage, natural gas supply.
Duration of work: 08.2004 until 12.2004.

Conference Centre “Olympic Hall” with 2.500 seats at the hotel complex Porto Karras, Chalkidiki

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, natural gas supply. Duration of work: 03.2004 until 06.2005.
Duration of work: 03.2004 until 06.2005.

Hotel “Londa’s Beach”, Lemesos, Cyprus

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, rainwater drainage.
Duration of work: 01.2004 until 05.2004.

Museum Benaki, Piraeus Street 138, Athens

Works included potable water supply, sewage water, fire fighting, heating and chilled water pipe work, natural gas supply.

Duration of work: 08.2002 until 03.2004

Panthessaliko Stadium, Nea Ionias, Volos

Works included potable water supply, sewage water, fire fighting and extinguishing networks CO2, rainwater drainage, natural gas supply, heating and chilled water pipe work.

Duration of work: 05.2002 until 06.2004

Supermarket building for company LIDL at Thivon 40, Piraeus

Works included potable water supply, sewage water, fire fighting, rainwater drainage, heating and chilled water pipe work, natural gas supply.

Duration of work: 03.2002 until 11.2002

Hotel “Ledra Marriott” at Syngrou Street 115, Athens. Refurbishment, alteration and enlargement of existing building

Works included potable water supply, sewage water, fire fighting and sprinkler network, rainwater drainage, heating and chilled water pipe work, natural gas, compressed air, installation of new chillers, refurbishment of plant rooms.

Duration of work: 02.2002 until 06.2004

Building for Emboriki Bank at Sofokleos Street, Athens

Works included potable water supply, sewage water, fire fighting and stopping networks, rainwater drainage, heating and chilled water pipe work, ventilation ductwork.

Duration of work: 11.2001 until 03.2002

Central garage building with five levels for municipal of Piraeus

Central garage building with five levels for municipal of Piraeus. Works included potable water supply, sewage water, fire fighting and sprinkler network, rainwater drainage.

Duration of work: 08.2001 until 02.2003

Office Building with seven levels at Posidonos Street, Glyfada

Works included potable water supply, sewage water, rainwater drainage, heating and chilled water pipe work, fire fighting and sprinkler network, ventilation duct work. 

Duration of work: 03.2001 until 08.2002

Data Center ’’MED NAUTILUS’’, Area of Metamorfosi & Koropi

Total construction and works included as : fire fighting and extinguishing CO2 networks, air conditioning.

Work started at 2001 until 2002

ABELA CATERING Building at the New Athens International Airport

The works included heating and chilled water pipe work, sprinkler network, rainwater drainage and ventilation ductwork.

Duration of work: 06.2000 until 07.2001

Petrol Filling Stations at the motorway Athens – Lamia for company EKO

The works included the pipe works for petrol supply, potable water supply, sewage water, rainwater drainage, heating and chilled water pipe work, ventilation ductwork, fire and extinguishing CO2 networks, natural gas supply and installation of chimney.

Duration of work: 05.1998 until 02.2000

Petrol Filling Station for company SHELL at the New Athens International Airport

The works included the pipe works for petrol supply, potable water supply, sewage water, rainwater drainage, heating and chilled water pipe work, ventilation ductwork, natural gas supply and installation of chimney.

Duration of work: 04.2001 until 02.2002

Operating Buildings for company TIM in Patras, Kavala, Larissa and Thessaloniki

Works included potable water supply, sewage water, fire fighting and sprinkler network, heating and chilled water pipe work, natural gas supply.